Selection
Here you can get an insight into
our completed projects
Robert Bosch Semiconductor
in Dresden
Friedrich-Wöhler-Institut
at the Georg-August-Universität in Göttingen
Ernst-Moritz-Arndt-Universität
Conversion of laboratory 1.25 in Greifswald
Fraunhofer Institut
Green Factory in Augsburg
Concept Laser GmbH in Lichtenfels
Gas warning systems for monitoring of oxygen level
BASF Münster
Disposal of solvents
Interfakultäres Institut
in Tübingen
BMW Werk München
New building of battery technology
Ruhr-Universität Bochum
Laboratories in the molecular plant physiology
Project:
xxxxx
Services:
- xxxxx
Completed:
xx/xxxx
Project:
Gottfried-Wilhelm-Leibniz-Universität Hannover, Reconstruction of Building 8113 – Construction of additional laboratory and examination rooms
Services:
- approximately 330 m Stainless steel piping system via compression fitting, for high purity gases
- gas tapping points for Nitrogen, Argon, Helium
- compressed gas cylinder cabinet
- installation and comissioning of DEMI water system including mixbed-demineralizer unit
- pressure test and microbiological examination
Completed:
05/2021
Project:
BASF Building B310 in Antwerp (Belgium)
Services:
- installation of Pipeline Network comprising stainless steel and copper pipes (460m) for the central supply of laboratory gas tapping points (Ar, ArCH4, H2, He, N2, Compressed Air, Vacuum)
- installation of Water Supply Network (demineralised, cold and process water)
Completed:
08/2020
Project:
Westfälische-Wilhelms-Universität, Multi-Scale-Imaging-Center (MIC) in Münster
Services:
- 133 m super insulated supply line for liquid nitrogen with shut-off valves and phase separator
- installation of a pipeline network consisting of 600 m of soldered copper pipe (in high purity gas quality) from station or battery pressure reducers with inherent gas flushing to the transfer points in the laboratories
Completed:
07/2020
Project:
University hospital in Düsseldorf, Medical Research Centre I read more
Services:
- construction of a supply network for laboratories on an area of 8500 m²
- supply network incorporates centralised and decentralised lines of soldered copper pipes for fuel gas, Nitrogen, Carbogen (O2 / CO2), Oxygen, Helium, Argon
- installation of Gas Warning Systems for detection of Oxygen and Carbon-Dioxide concentrations
- installation of flow meters, consumption measuring devices and gas shortage alarm systems
Completed:
10/2020
Project:
Merck Research Centre for Electronic Applications, Building E 65 in Darmstadt read more
Services:
- installation of -old insulated pipeline network made of Stainless steel and
- connection to existing lines and laboratory furniture
Completed:
09/2020